Open
Closes in 27 days · 49/2026/BP
Construction of track connecting Slitinia and Zaouiate Cherradi (2.1 km) — Loudaya commune, Marrakech Prefecture
Construction of track connecting Slitinia and Zaouiate Cherradi (2.1 km) — Loudaya commune, Marrakech Prefecture — published by Prefecture of Marrakech in Marrakech. The published budget is 2 704 418 DHS. Bids close on October 13, 2026. When the buyer announces a result, it appears on this page.
- Buyer
- Prefecture of Marrakech
- Category
- Works
- Sector
- Road, Path and Track Works
- Location
- Marrakech
- Reference
- 49/2026/BP
- Published
- September 15, 2026
- Closing
- October 13, 2026
- Published budget
- 2 704 418 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Bids close in
27 days
October 13, 2026
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Works
- Road, Path and Track Works