Awarded
July 2, 2026 · 17/2026/ABHT
Etude contrat gestion participative — Nappe Haouz Mejjate
Etude contrat gestion participative — Nappe Haouz Mejjate — published by Tensift Hydraulic Basin Agency in Marrakech, Al Haouz. The published budget is 1 068 000 DHS. Bids closed on July 2, 2026. The contract was awarded to ANZAR CONSEIL.
- Buyer
- Tensift Hydraulic Basin Agency
- Category
- Services
- Sector
- Engineering studies
- Location
- Marrakech, Al Haouz
- Reference
- 17/2026/ABHT
- Published
- June 11, 2026
- Closing
- July 2, 2026
- Published budget
- 1 068 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Services
- Engineering studies