February 13, 2025 · 1/2025
Contrôle études et travaux construction hôpital de proximité de Tafraout (Tiznit)
Contrôle études et travaux construction hôpital de proximité de Tafraout (Tiznit) — published by Regional Directorate of the National Agency of Public Equipment of the South in Tiznit. The published budget is 1 524 000 DHS. Bids closed on February 13, 2025. The contract was awarded to COTEC BUREAU DE CONTROLE DE TE.
- Buyer
- Regional Directorate of the National Agency of Public Equipment of the South
- Category
- Services
- Sector
- Consulting, audit and project owner control assistance (excluding the field of new technologies)
- Location
- Tiznit
- Reference
- 1/2025
- Published
- February 23, 2026
- Closing
- February 13, 2025
- Published budget
- 1 524 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Published by
Regional Directorate of the National Agency of Public Equipment of the South
See this buyer →What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Souss-Massa
- Services
- Consulting, audit and project owner control assistance (excluding the field of new technologies)