Awarded
June 14, 2024 · 15/S/2024
Réhabilitation de deux écoles pionnières Zalaga et Oulad Slimane (El Beddouza, Safi)
Réhabilitation de deux écoles pionnières Zalaga et Oulad Slimane (El Beddouza, Safi) — published by Provincial Directorate of National Education of Safi in Safi. The published budget is 675 154 DHS. Bids closed on June 14, 2024. The contract was awarded to STE BELACHIR EQUIPEMENT.
- Buyer
- Provincial Directorate of National Education of Safi
- Category
- Works
- Sector
- Construction and Development Works
- Location
- Safi
- Reference
- 15/S/2024
- Published
- February 23, 2026
- Closing
- June 14, 2024
- Published budget
- 675 154 DHS
- Procedure
- Simplified open call for tenders
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Works
- Construction and Development Works