Awarded
March 20, 2025 · 02/2025/BC/CTZ
Conception et suivi de la construction d'un stade de football au centre de Zekten
Conception et suivi de la construction d'un stade de football au centre de Zekten — published by Municipality of Zerkten in Al Haouz. The published budget is 3 500 000 DHS. Bids closed on March 20, 2025. The contract was awarded to DOUBLEVEES ARCHITECTES.
- Buyer
- Municipality of Zerkten
- Category
- Services
- Sector
- Engineering studies
- Location
- Al Haouz
- Reference
- 02/2025/BC/CTZ
- Published
- February 23, 2026
- Closing
- March 20, 2025
- Published budget
- 3 500 000 DHS
- Procedure
- Open architectural consultation
- Lots
- Single lot
Awarded to
DOUBLEVEES ARCHITECTES
Named by the buyer. The amount is not published here.
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Services
- Engineering studies