Open
Closes in 16 days · 38/2026/DAH
Execution study of the FALIT dam construction works, Figuig Province
Execution study of the FALIT dam construction works, Figuig Province — published by Director of Hydraulic Works in Figuig. The published budget is 16 116 000 DHS. Bids close on September 24, 2026. When the buyer announces a result, it appears on this page.
- Buyer
- Director of Hydraulic Works
- Category
- Services
- Sector
- Engineering studies
- Location
- Figuig
- Reference
- 38/2026/DAH
- Published
- August 11, 2026
- Closing
- September 24, 2026
- Published budget
- 16 116 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Bids close in
16 days
September 24, 2026
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Oriental
- Services
- Engineering studies