Awarded
July 10, 2026 · 109/2026/SAO
Etudes de syntheses et BIM management pour le stade de Nador
Etudes de syntheses et BIM management pour le stade de Nador — published by Al Omrane Company of the Oriental Region in Nador. The published budget is 1 632 000 DHS. Bids closed on July 10, 2026. The contract was awarded to CONTINUUM ENGINEERING CONSULTA.
- Buyer
- Al Omrane Company of the Oriental Region
- Category
- Services
- Sector
- Engineering studies
- Location
- Nador
- Reference
- 109/2026/SAO
- Published
- June 17, 2026
- Closing
- July 10, 2026
- Published budget
- 1 632 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Awarded to
CONTINUUM ENGINEERING CONSULTA
Named by the buyer. The amount is not published here.
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Oriental
- Services
- Engineering studies