Closes in 9 days · 33/2026
Construction study of road RR107 (km 118+500 to 170+300), Tata Province
Construction study of road RR107 (km 118+500 to 170+300), Tata Province — published by Provincial Director of Equipment, Transport, Logistics and Water of Tata in Tata. The published budget is 519 984 DHS. Bids close on September 16, 2026. When the buyer announces a result, it appears on this page.
- Buyer
- Provincial Director of Equipment, Transport, Logistics and Water of Tata
- Category
- Services
- Sector
- Engineering studies
- Location
- Tata
- Reference
- 33/2026
- Published
- August 11, 2026
- Closing
- September 16, 2026
- Published budget
- 519 984 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Bids close in
9 days
September 16, 2026
Published by
Provincial Director of Equipment, Transport, Logistics and Water of Tata
See this buyer →What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Souss-Massa
- Services
- Engineering studies