Open
Closes in 3 days · 41/2026/DPA/52
Rehabilitation of the connection pipeline from Rkiza dam to the water supply network, Figuig
Rehabilitation of the connection pipeline from Rkiza dam to the water supply network, Figuig — published by Provincial Director of Agriculture Figuig Bouarfa in Figuig. The published budget is 991 258 DHS. Bids close on September 16, 2026. When the buyer announces a result, it appears on this page.
- Buyer
- Provincial Director of Agriculture Figuig Bouarfa
- Category
- Works
- Sector
- Sanitation, drinking water and various networks works
- Location
- Figuig
- Reference
- 41/2026/DPA/52
- Published
- July 27, 2026
- Closing
- September 16, 2026
- Published budget
- 991 258 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Bids close in
3 days
September 16, 2026
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Oriental
- Works
- Sanitation, drinking water and various networks works