Awarded
April 30, 2026 · 10/2026/BP
Contrôle de qualité des travaux de construction de la piste reliant entre la RN7 et Douar Ait Messao
Contrôle de qualité des travaux de construction de la piste reliant entre la RN7 et Douar Ait Messao — published by Prefecture of Marrakech in Marrakech. The published budget is 15 270 DHS. Bids closed on April 30, 2026. The contract was awarded to INGENIERIE DES MATERIAUX ET SO.
- Buyer
- Prefecture of Marrakech
- Category
- Services
- Sector
- Testing, Control and Laboratory Services
- Location
- Marrakech
- Reference
- 10/2026/BP
- Published
- March 19, 2026
- Closing
- April 30, 2026
- Published budget
- 15 270 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Services
- Testing, Control and Laboratory Services