Awarded
August 28, 2026 · 39/2026/DAH
Updating design studies for Jbel Lakhal dam, Figuig
Updating design studies for Jbel Lakhal dam, Figuig — published by Director of Hydraulic Works in Figuig. The published budget is 2 040 000 DHS. Bids closed on August 28, 2026. The contract was awarded to CONSEIL INGENIERIE ET DEVELOPP.
- Buyer
- Director of Hydraulic Works
- Category
- Services
- Sector
- Engineering studies
- Location
- Figuig
- Reference
- 39/2026/DAH
- Published
- July 11, 2026
- Closing
- August 28, 2026
- Published budget
- 2 040 000 DHS
- Procedure
- Open call for tenders
- Lots
- Single lot
Awarded to
CONSEIL INGENIERIE ET DEVELOPP
Named by the buyer. The amount is not published here.
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Oriental
- Services
- Engineering studies