September 1, 2025 · 21/2025
ETUDE TECHNIQUE ; SUIVI ET CONTROLE DES TRAVAUX DE : *-AMENAGEMENT DE LA PISTE AIT OUFALLA SUR 4Km *- AMENAGEMENT DE LA PISTE RELIANT LA ROUTE 7075 ET DOUR AIT ALI OUCHAOU SUR 2Km *- COSTRUCTION DE LA ROUTE LIANT LA COOPERATIVE AL AAZIZA ET LA ROUTE N° 7040 SUR 1.5 Km *- AMENAGEMENT DE LA PISTE RELIANT DOUAR AIT OUMGHAR ET LA ROUTE N° 7050 SUR 2Km
ETUDE TECHNIQUE ; SUIVI ET CONTROLE DES TRAVAUX DE : *-AMENAGEMENT DE LA PISTE AIT OUFALLA SUR 4Km *- AMENAGEMENT DE LA PISTE RELIANT LA ROUTE 7075 ET DOUR AIT ALI OUCHAOU SUR 2Km *- COSTRUCTION DE LA ROUTE LIANT LA COOPERATIVE AL AAZIZA ET LA ROUTE N° 7040 SUR 1.5 Km *- AMENAGEMENT DE LA PISTE RELIANT DOUAR AIT OUMGHAR ET LA ROUTE N° 7050 SUR 2Km — published by Rural Municipality of Laqsir in El Hajeb. Bids closed on September 1, 2025. The contract was awarded to BORHAN COMPANY FOR ENGINEERING STUDIES.
- Buyer
- Rural Municipality of Laqsir
- Category
- Services
- Location
- El Hajeb
- Reference
- 21/2025
- Published
- August 28, 2025
- Closing
- September 1, 2025
- Procedure
- Études, conseil et formation
- Lots
- Single lot
Awarded to
BORHAN COMPANY FOR ENGINEERING STUDIES
Named by the buyer. The amount is not published here.
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Fez-Meknes
- Services