May 22, 2024 · 04/2024
1-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR AKHFERGUA SUR UNE LONGUEUR D’ENVIRON 2 KM A LA COMMUNE AFELLAEISSEN. 2-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR ZAOUIAT TIZI SUR UNE LONGUEUR D’ENVIRON 1 KM A LA COMMUNE AFELLAEISSEN. 3-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR TISGHIT SUR UNE LONGUEUR D’ENVIRON 3 KM A LA COMMUNE AFELLAEISSEN.
1-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR AKHFERGUA SUR UNE LONGUEUR D’ENVIRON 2 KM A LA COMMUNE AFELLAEISSEN. 2-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR ZAOUIAT TIZI SUR UNE LONGUEUR D’ENVIRON 1 KM A LA COMMUNE AFELLAEISSEN. 3-ETUDE TECHNIQUE DE CONSTRUCTION DE LA PISTE ALLANT AU DOUAR TISGHIT SUR UNE LONGUEUR D’ENVIRON 3 KM A LA COMMUNE AFELLAEISSEN. — published by Foundation for Intercommunal Cooperation Chichaoua Al Ghad in Chichaoua. Bids closed on May 22, 2024. The contract was awarded to C2I ETUDES.
- Buyer
- Foundation for Intercommunal Cooperation Chichaoua Al Ghad
- Category
- Services
- Location
- Chichaoua
- Reference
- 04/2024
- Published
- May 19, 2024
- Closing
- May 22, 2024
- Procedure
- Études, conseil et formation
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Marrakech-Safi
- Services