Awarded
February 27, 2026 · 02/CSB/2026
ÉTUDE TECHNIQUE DES TRAVAUX DE CONSTRUCTION DE VOIRIE AU NIVEAU DE L’AVENUE ANACER SUR UNE LONGEUR DE 1 KM A PARTIR DE LA RP4002
ÉTUDE TECHNIQUE DES TRAVAUX DE CONSTRUCTION DE VOIRIE AU NIVEAU DE L’AVENUE ANACER SUR UNE LONGEUR DE 1 KM A PARTIR DE LA RP4002 — published by Urban Municipality of Sidi Abi Al Kanadil in Sale. Bids closed on February 27, 2026. The contract was awarded to ALPHA ENGINEERING AND CONSULTING.
- Buyer
- Urban Municipality of Sidi Abi Al Kanadil
- Category
- Services
- Location
- Sale
- Reference
- 02/CSB/2026
- Published
- February 25, 2026
- Closing
- February 27, 2026
- Procedure
- Études, conseil et formation
- Lots
- Single lot
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Open
Bids are still being taken. The closing date is on the page.
Closed
Bids are in. No result has been announced yet, and we do not guess at one.
Awarded
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Rabat-Sale-Kenitra
- Services