September 1, 2025 · 51/2025
étude technique et suivi des travaux de réalisation de la centrale solaire photovoltaïque et travaux d’achèvement de construction et équipement de l’abattoir de Berkane
étude technique et suivi des travaux de réalisation de la centrale solaire photovoltaïque et travaux d’achèvement de construction et équipement de l’abattoir de Berkane — published by Urban Municipality of Berkane in Berkane. Bids closed on September 1, 2025. The contract was awarded to FRACTAL ENGINEERING.
- Buyer
- Urban Municipality of Berkane
- Category
- Services
- Location
- Berkane
- Reference
- 51/2025
- Published
- August 29, 2025
- Closing
- September 1, 2025
- Procedure
- Études, conseil et formation
- Lots
- Single lot
Awarded to
FRACTAL ENGINEERING
Named by the buyer. The amount is not published here.
What happens when this closes
The page does not disappear. It changes state, and answers a different question — who won it.
Bids are still being taken. The closing date is on the page.
Bids are in. No result has been announced yet, and we do not guess at one.
The buyer named a winner. We publish the name — never the amount.
Where this sits
- Oriental
- Services